Showing posts with label CGEWHO. Show all posts
Showing posts with label CGEWHO. Show all posts

Monday, June 14, 2010


Central Government Employees Welfare Housing Organisation (CGEWHO) - Announces Kolkata (Phase - II) Housing Scheme.


GEWHO - Announces Kolkata (Phase - II) Housing Scheme.

This site is located near Kolkata Airport on Belghoria Expressway.

Applications are invited from the eligible categories under Prioriy I and II.

SALE OF APPLICATIONS:

Interested applicants may obtain the 'CGEWHO Rules' brochure on payment of Rs. 100/- in cash or through Bank Draft in favour of CEO, CGEWHO payable at New Delhi, from any of the following:

(i) CGEWHO's Head Office at New Delhi from 14.06.2010.

(ii)CGEWHO's site office at Belghoria Expressway (Contact Person Md. Maniruzzaman, Project Manager-Kolkata : 09830634289) from 14.06.2010.

(iii)By downloading from CGEWHO's official website. In such a case, Rs.100/- may be added towards cost of Application Form.

RECEIPT OF APPLICATIONS & LAST DATE: Duly completed applications are to be sent to the CGEWHO's Head Office only latest by 13.08.2010

Click here to see this Advertisement

Scheme Brochure / Application Form

Category: articles

Friday, May 14, 2010

On 7th May 2010, Central Government Employees Welfare Housing Organisation (CGEWHO) released letter for Construction of Group Housing complex at Parathipattu, Poonamallee Road, Chennai

Details in the Letter.
No. : T-109/11                                                                                  07 May 10

To all the beneficiaries of Chennai (Ph II) project

Sub : Construction of Group Housing complex at Parathipattu, Poonamallee Road, Chennai

Sir/ Madam,

As you are aware that Chennai (Ph II) project is progressing and most of the structural works are already stands completed. We have also taken up the finishing works and accordingly the following revisions were made in the specifications of the following items :

i) As per the scheme & technical brochure the door frames are to be of pressed steel frames. In view of the feed back received with regard to the rusting of the frames, it was decided to provide factory made RCC door frames which are of better specification than pressed steel frame considering the cost involved.

ii) Considering the present trend as well as technical aspects, the specifications of flooring were reviewed. This is mainly due to the reasons that the availability of the marble of the same shade for such a mass housing project has become very difficult. Further mosaic tiles has become a real
obsolete specification and is not presentable in quality house. Considering the technical and aesthetic betterment, it was decided to provide 600 x 600 mm vitrified tiles of marble finish in the drawing and dining room as well as 400 x 400 mm off white ivory shade rectified tiles (Edge cut ceramic tiles) in all other rooms. It is to inform you that the above changes are technically superior than the original specifications. Further it is to inform you that the colour scheme adopted in drawing/ dining room is of marble finish which shall resemble to marble flooring. The off-white colour in all other rooms are considered to give a matching look.

2. A comparison between mosaic/ marble flooring and vitrified/ rectified flooring is placed in Annexure A.

Yours faithfully,
(M Narayanan)
Dy Director (Tech)
for Chief Executive Officer






















































































































































Annexure A :         COMPARISION OF FLOORING TYPES
     
S.NO.
ATTRIBUTES
VITRIFIED
TILES/ RECTIFIED TILES
MOSAIC
TILES
MARBLE
     
1StainStain
free
will
stain
will
stain
2Heat/fire
resistance
No effectTurns
Black
Turns
Black
3Water
resistance
water
proof
absorbs
water
absorbs
water
4
Acid/Alkali resistance
No effectHighly
effected
Highly
effected
5Colourswide
range
wide
range
limited
natural range
6Designswide
range
wide
range
limited
natural range
7Bending
strength Kg/cm
400100220
8weight in
Kg/sq.m.
164870
9Porositynon
porous
PorousPorous
10EchoProofLowHigh
11BacteriaFreeHigh
effect
High
effect
12Performance in 10 or
more years
As good as newstained lookstained look and gets
rough
13Thermal
Insulation
Good
insulation
Bad
insulator
Bad
insulator
14SmellfreeMediumMedium
15
Maintenance
FreeRequiredRequired
16Fixing ease & timeeasy in 24 hrsdifficult
in 15days        

difficult in 30 days
17
Reflection of Light
HighLowMedium
Category: articles

Sunday, April 4, 2010

FOR ATTENTION OF THE CENTRAL GOVERNMENT EMPLOYEES



Central Government Employees Welfare Housing Organisation (CGEWHO) is an autonomous body functioning under the AEGIS of the Ministry of Housing & Urban Poverty Alleviation, Government of India CGEWHO has no other branch or affiliated organisation.

It has come to notice that Organisation with name as "Government Officials Welfare Organisation (GOWO) is giving advertisements offering flats/houses for Central and State Government employees. CGEWHO is not connected with Government Officials Welfare Organisation (GOWO)" in anyway.

Central Government Employees and all eligible categories of CGEWHO are advised to note this and should not get confused and carried away by such similar named organisations. They are requested to circulate this information to their colleagues.

Anybody dealing with the "Government Officials Welfare Organisation (GOWO)" shall do so on his own risk and responsibility and CGEWHO shall not be resposible in any manner whatsoever

Message from CGEWHO
Category: articles